DOLPH ROTFELD ENGINEERING, DIVISION OF AI ENGINEERS, INC., P.C.
  • About Us
  • General Projects
  • Signature Projects
    • Columbus Park
    • Edgewood Dr. Detention Basin
    • * New Castle Parking Lot *
    • Premier Plaza
  • Services
  • Staff
  • Contact Us
  • About Us
  • General Projects
  • Signature Projects
    • Columbus Park
    • Edgewood Dr. Detention Basin
    • * New Castle Parking Lot *
    • Premier Plaza
  • Services
  • Staff
  • Contact Us
Search

 

Signature Projects

Sleepy Hollow

Picture

 Shaft 9 Pump Station Concrete Pad

Picture

Shaft 9 - Installation of 2,400 gpm  Pump Station


Town of Mamaroneck Flint Park Outfall Pipe Installation

  • Remove and Dispose Existing Twin 4"  CMP Storm Drain Pipe and Structures
  • Furnish and Install 840' of new 72" CMP Polymer Coated Storm Drain
  • Repair Existing Manhole 
  • Furnish and install Stone Rip Rap 
  • Regrade and Restore  Site
Picture

Heathcote Manor Subdivision Stormwater Basin

Picture
 Stormwater Basin Construction 
Prior to Final Stabilization 
Picture
Final Stabilization of Stormwater Basin   

City of Rye Low Pressure Sewer System Design 

Picture
Instillation of 3,450 ft. Force Main 

Ossining DPW Yard 

Dolph Rotfeld Engineering, Division of AI Engineers, Inc., P.C. was lead consultant on the design team for the municipal public works garage and yard expansion project completed in 2004. The project included rehabilitation of the existing repair garage located in the old armory building, construction of a new 30,000 SF, two level storage garage, offices and lockers, integrated truck wash facility, related parking and outside storage areas, underground fuel tanks, pumps and monitoring system, fabric structure salt storage, installation of a new drainage system, and paving of the entire yard. After completion of design, our firm provided engineering construction support during the bid process and for the duration of the project, coordinating sub-consultant efforts in this respect.

Picture
Picture

Site Plan

Picture

Southwest Corner of DPW Garage

Picture

Aerial View

Picture

 Equipment and Truck Storage

Picture

 Office


Town of Mamaroneck  DPW Garage 

Dolph Rotfeld Engineering, Division of AI Engineers, Inc., P.C. was lead consultant on the design and construction administration team for the municipal public works garage and yard project completed in 2004. The project included rehabilitation of a portion of the existing storage garage and offices, construction of a new storage and repair facility (pre-engineered steel), pre-engineered salt dome structure, new above ground concrete fuel tanks, pumps and monitoring system, installation of new drainage system and environmental controls, rearrangement of exterior storage of solid waste trucking operation plan and paving of the entire yard. After completion of design, our firm was on-site full-time providing Construction Inspection and Administration. 

Picture
Picture
Picture
Powered by Create your own unique website with customizable templates.
  • About Us
  • General Projects
  • Signature Projects
    • Columbus Park
    • Edgewood Dr. Detention Basin
    • * New Castle Parking Lot *
    • Premier Plaza
  • Services
  • Staff
  • Contact Us